Press picture 71015
Construction site and assembly work for the construction of a new connecting lineder Erdgasleitung " Druschba-Trasse " in Taura, Saxony on the territory of the former GDR, German Democratic Republic
TAURA 15.11.1972
Construction site and assembly work for the construction of a new connecting lineder Erdgasleitung " Druschba-Trasse " in Taura, Saxony on the territory of the former GDR, German Democratic Republic. Photo: Sebastian Langkorn
Press photo ID: 71015
Image resolution: 3878 x 2760 pixels x 16 bit
compressed image file size: 2,66 MB
Image file size: 20,41 MB
Sources and credit: © eastgermanyimages.com/Sebastian Langkorn
Position: 50° 54' 8.36'' N / 12° 50' 1.3'' E